Tunnel Installations

Location: Hindhead, Surrey, UK
Date: 2011
Value: £1,000,000.000

The Hindhead Tunnel is a road tunnel that is part of the new Hindhead bypass for the A3 road in Surrey, UK. At 1.2 miles (12.83 km) in length, the tunnel is the longest non-estuarial road tunnel in the United Kingdom, and takes the road beneath the Devils Punch Bowl, a site of Special Scientific Interest. The tunnel was opened on the 27th July 2011.
Roomfoss Control Systems Ltd supplied a range of equipment to this project.

  • Main Low Voltage Switchboards
  • Stainless Steel Tunnel Emergency Distribution Panels
  • Stainless Steel Tunnel Emergency Panels
  • LED Tunnel Signage
     

« Previous

Case study 5 of 5

« Return to Case Studies page

Hindhead Tunnel Tunnel Under Construction1 Tunnel Under Construction 2

Click on images above to enlarge

Follow Roomfoss on Twitter Follow Roomfoss on Twitter Watch Roomfoss' YouTube Channel Watch Roomfoss' YouTube Channel
Close Message Warning

This web site uses cookies for functionality and analysis purposes. These do not give us, or any third party, access to your computer or any personal information about you. For more information please read our privacy policy.